Phase 1 consisted of 6,505 ft2of roof area captured by two 530-gallon cisterns to a rain garden, with two outfalls to the sidewalk along 39thAve NW.
Phase 2 installed a second rain garden, with two outfalls to the sidewalk on SW Thistle Street.
Phase 3 installed three 420-gallon cisterns with outlet to side sewer to complete the multi-phase project.